MODERN METHODS FOR MANUFACTURING PLANNING AND SCHEDULING

Abstract

The paper deals with modern methods which can be used for planning and scheduling of manufacturing systems. Creating of production plans, using different software products is discussed. Advanced planning and scheduling methods are used for planning and scheduling. The outputs as Gantt charts are presented. Different optimization methods are applied for schedule optimization. Production plan, for every machine is created, after applying the optimization. Scheduling by using Lekin, ‘Spreadsheets’ and Asprova is described and compared.

Recommended articles

COMPARISON OF TAGUCHI'S PARTIAL CORRECTION TECHNIQUE WITH CONTROL CHARTS

LUBOS KOTEK, ALES NOSEK, ALOIS FIALA, JIRI ZAHALKA
Keywords: statistical process control | control charts | Taguchi's partial correction | hole reaming | Beta correction

SAFETY CULTURE AND AGILE

VERA PELANTOVA, JANA VITVAROVA
Keywords: agile methods | safety culture | safety aspect | organisation management system | agile team | Scrum

BASIC ALGORITHMS OF INPUT SHAPING AUTOTUNING

MACIEJ GNIADEK, STEFAN BROCK
Keywords: input shaping | command generation | autotuning | two-mass system

DETERMINATION OF THE GRAIN GROWTH KINETICS AS A BASE PARAMETER FOR NUMERICAL SIMULATION DEMAND

JAROMIR MORAVEC
Keywords: grain size | numerical simulation | X10CrWMoVNb9-2 steel | 18Cr9Ni3CuNbN steel | Welding | Gleeble